Cuprora/Process

From files to commissioning. No black box.

Five stages, each with an input, an output and a decision owner. You know what you get and when — and if something is wrong, you know before the invoice, not after.

01 / STAGES

Five stages

01

Files and brief

We collect everything that describes the board and the test. Gaps are named immediately — that saves a week later.

We need
  • Gerber or ODB++
  • Netlist
  • STEP / 2D drawing
  • Test point list
  • Component heights
You get
  • Gap checklist
  • Confirmed scope
  • Initial feasibility view
02

DFT review

We check whether the board can be tested. This is the stage where a layout change is most often needed — better to know now.

We need
  • Layout
  • Schematic
  • Component description
You get
  • Risk list
  • Change recommendations
  • Decision: fixture or board change first
03

Design and quote

We design the geometry, probe layout and clamping. The quote includes scope, price and date. No open-ended “from”.

We need
  • Scope approval
  • Priority: cost / date / function
You get
  • Dated quote
  • Pin map
  • Assembly drawing
  • Bill of materials
04

Build

Printing, aluminium, assembly, wiring. If something doesn't fit, we fix it here — we don't ship half-finished hardware.

We need
  • Purchase order
  • Deposit / terms
You get
  • Assembled fixture
  • Build documentation
  • Measurement results
05

Commissioning

Test on your board, measurements, corrections and handover. You learn to replace probes and read the map — you are not dependent on service.

We need
  • Test board
  • Access to interfaces
You get
  • Commissioning report
  • File package
  • Instructions
  • Training
02 / Files and data

File checklist

You don't need everything. The more you have, the faster and cheaper it gets — but missing data is not a reason to avoid the conversation.

Gerber X2

Copper, mask, silkscreen, holes and attributes.

ODB++ / IPC-2581

If you have it — it contains more than Gerber.

IPC-D-356 netlist

Electrical connections and point coordinates.

STEP / 2D

Board and component geometry, heights.

TP list

Which nets, which pads, which tolerances.

Test description

What must be checked and the pass/fail criteria.

Photos

Assembly variant, unusual components, access.

Volume

Batch size, number of revisions, production plan.

03 / Risks

What most often goes wrong

No test points

Pads are under components or missing entirely. Fix: DFT review before ordering boards.

Wrong pitch

1.27 mm probes on 0.4 mm pads — physics wins. Fix: access verification and probe selection.

Tall components

The press rests on a component instead of the board. Fix: pockets and supports in the insert.

Revision change mid-project

Fixture and board are designed in parallel. Fix: freeze the revision before the build.

04 / COMMUNICATION

How we communicate

One contact on our side, a weekly status and a clear decision list. We don't send “updates” that say nothing. If a date moves, you hear it on the day we know.

Send your files for an initial review

A Gerber and a test point list is enough. We will sort the rest within 24 hours — or tell you what is missing.

Send your files We reply within 24 business hours